Renewable Energy Profiling System

In partnership with CSIRO and Vaisala, Hybrid Systems Australia has developed the Renewable Energy Profiling System (REPS). REPS includes state of the art wind profiling and cloud prediction technology, allowing clients to assess future distributed energy resource installations using site-specific renewable energy data.

BENNCO BIDILTHA SPS

Hybrid Systems Australia in collaboration with Magellan Power, delivered a stand alone power system (SPS) to Bennco Group for the Gumala Aboriginal Corporation and the remote community of Bidiltha. The SPS has been implemented to reduce the remote WA community’s reliance on diesel generated power.

BENNCO WILLIMARA SPS

Hybrid Systems Australia in collaboration with Magellan Power, delivered a stand alone power system (SPS) to Bennco Group for the Gumala Aboriginal Corporation and the remote community of Wirrillimarra. The SPS has been implemented to reduce the remote WA community’s reliance on diesel generated power.

DIESEL GENERATOR OFF POWER-SUPPLY

Hybrid Systems Australia designed, built in house and commissioned Lithium Battery and Inverter enclosure for a mining client. 92kWh/180kW lithium battery system to achieve Diesel Generator OFF power supply.

MEEKATHARRA SOLAR POWER STATION

In August 2017 Hybrid Systems Australia (HSA) successfully completed the design, installation and integration of the Meekatharra Solar Power Station, positioned in the remote Western Australian town of Meekatharra, located roughly 750 km from Perth.

CARNARVON DISTRIBUTION ENERGY RESOURCE

Hybrid Systems Australia was awarded a contract by Horizon Power to provide a BESS facility in order to perform ground breaking Distributed Energy trials within the town of Carnarvon. In collaboration with ARENA, funding to the value of $1.92m was provided for the DER project which included multiple aspects of renewable energy components.

HYBRID CONTAINER

In March 2016 Hybrid Systems Australia successfully completed Factor Acceptance Testing (FAT) on HSA’s first Hybrid Container, which was later installed by the client on site in Port Hedland, Western Australia.