Project Name: | Derby |
---|---|
Location: | Derby, WA |
Client: | Spinifex Hotel |
Fuel Source: | Solar, Battery |
Battery: | 58kWh |
Solar DC PV: | 96kWp |
In 2018, Hybrid Systems Australia was contracted to design, manufacture and install 95kWP of solar PV and a 57kWh solar smoothing BESS to the Horizon Power network, for the Spinifex Hotel in Derby, WA.
This resulted in significantly reduced electricity costs by allowing a higher renewable penetration while maintaining network stability.