Cue

Project Name: Cue
Location: Cue, WA
Client: Water Corporation
Battery: 548kWh
Solar DC PV: 100kWp
Thermal Diesel: 100kVA

Hybrid Systems was engaged by Guidera O’Connor for the design, manufacturing, installation and commissioning of a hybrid renewable energy system for the Water Corporation Wastewater Treatment Plant (WWTP) located at Cue, in the remote Mid-West region of Western Australia.

The system can operate as either grid connected or as an islanded off-grid system and included a 58kWh BESS, 100kWp of Solar and a 100kVa Diesel generator. A key benefit for Water Corp includes the ability to disconnect from the grid and operate the system in hydrocarbon off during sunlight hours reducing both carbon emissions and costs.