Mt Magnet

Project Name: Mt Magnet
Location: Mt Magnet, WA
Client: Water Corporation
Battery: 58kWh
Solar DC PV: 202kWp
Thermal Diesel: 100kVa

Hybrid Systems was engaged by Guidera O’Connor for the design, manufacturing, installation and commissioning of a hybrid renewable energy system for the Water Corporation Wastewater Treatment Plant (WWTP) located at Mt Magnet, in the remote Mid-West region of Western Australia.

The system can operate as either grid connected or as an islanded off-grid system and included a 58kWh BESS, 202kWp of Solar and a 100kVa Diesel generator. A key benefit for Water Corp includes the ability to disconnect from the grid and operate the system in hydrocarbon off during sunlight hours reducing both carbon emissions and costs.