Project Name: | Marble Bar |
---|---|
Location: | Marble Bar, WA |
Client: | Horizon Power |
Fuel Source: | Battery |
Commodity / Type: | Township |
Battery: | 584kWh |
In 2021, Hybrid Systems completed the design, construction and installation of a BESS at the remote regional town of Marble Bar in the Pilbara region of WA for Horizon Power. The project was one of multiple BESS installations in regional towns to allow for increased access to renewable energy and to enable additional rooftop solar systems.