Coral Bay

Project Name: Coral Bay
Location: Coral Bay, WA
Client: Synergy
Capacity: 0.5 MW
Fuel Source: Battery
Project Commencement: 2021
Commodity / Type: Township
Battery: 344kWh

In 2021, Hybrid Systems Australia integrated a 576kw BESS and control system into Synergy’s existing Coral Bay diesel and wind generation facilities, equipping the system with ‘hydrocarbons off’ capabilities.

The sophisticated control system is capable of switching off all diesel generation when renewable energy and BESS back-up is sufficient, and then seamlessly re-engaging it when required. As a result, the entire town can be powered emissions-free when conditions are favourable to wind generation.